As the new North Zone Booster Station came online, several people from the utility watched and monitored the pressure gauges, as water-utility employee Jeff Crook does here. All the pipes sit on a concrete pad called a “skid,” which was dropped into the building through the top, before the roof was affixed. Debbie Griffin photo.
Read the article: City flips switch on new water utility
